Skip to main content

REQUIREMENTS

The following documents were prepared to aid you in obtaining electric service or interconnecting with Distributed Generation (i.e. solar or backup generator) to Trico’s electric distribution system.

ELECTRIC SERVICE
REQUIREMENTS

ELECTRIC SERVICE REQUIREMENTS

INTERCONNECTION
REQUIREMENTS
AND MANUAL

  • Utility scale renewable generation system
  • Residential co-generation (rooftop solar)
  • Commercial or Industrial emergency generator
  • Any other separate or parallel generation

INTERCONNECTION REQUIREMENTS



INTERCONNECTION MANUAL

Authority Having Jurisdiction (AHJ) Permit Information

AHJ Contact Information

Before work can be undertaken, Trico applicants need to obtain permits from proper Authority Having Jurisdiction (AHJ):

    • Pima County  – Central Permits, 201 N. Stone – 1st floor, Tucson, AZ 85701
      • (520) 724-9000
    • Pinal County – Building Safety, 31 N. Pinal St. – Building F, PO BOX 1610, Florence, AZ 85132
      • (520) 866-6405
    • Town Of Marana  – Building Safety, 11555 W. Civic Center Dr., Marana, AZ 85653
      • (520) 382-2600
    • Town Of Sahuarita –  Building Safety, 375 W. Sahuarita Center Way, Sahuarita, AZ 85629
      • (520) 822-8866
    • City Of Tucson – Development Services, 201 N. Stone – 1st floor (North Side), Tucson, AZ 85701
      • (520) 791-5550
    • State Of Arizona – Office of Manufactured Housing, 1110 W. Washington St., Ste.100, Phoenix AZ 85007
      • (602) 771-1000