Smart Hub Logo SmartHub Log-in PAY NOW
Power is out at the Green Valley Substation. Thank you for your patience.

REQUIREMENTS

The following documents were prepared to aid you in obtaining electric service or interconnecting with Distributed Generation (i.e. solar or backup generator) to Trico’s electric distribution system.

ELECTRIC SERVICE
REQUIREMENTS

  • New electric service installation
  • Temporary construction service
  • Service upgrade or relocation
  • Residential co-generation (rooftop solar)
  • Trenching and conduit
  • Residential backup generator
  • Working space and clearances

ELECTRIC SERVICE REQUIREMENTS

INTERCONNECTION
REQUIREMENTS

  • Utility scale renewable generationsystem
  • Residential co-generation (rooftop solar)
  • Commercial or Industrial emergency generator
  • Any other separate or parallelgeneration

INTERCONNECTION REQUIREMENTS

GET IN TOUCH

FAX: (520) 353-1640

WHERE TO FIND US

Trico Electric Cooperative
8600 W. Tangerine Rd.
Marana, AZ 85658

Opening Hours:
Mon – Fri: 8:00 a.m. – 4:30 p.m.

OUR NEWSLETTER

Sign up for LIVEWIRE, our
monthly newsletter.