Skip to main content

INSTALLER RESOURCES


INSTALLER PACKET

Packet to be completed by any Installer or General Contractor installing or causing to be installed, a Residential and or NonResidential
Distributed Generating (DG) Facility, including leased systems, in the Trico service territory.

ELECTRIC SERVICE REQUIREMENTS

Documents to aid you in obtaining electric service or interconnecting with Distributed Generation (i.e. solar or backup generator) to Trico’s electric distribution system.

INTERCONNECTION REQUIREMENTS

Review and download Trico’s requirements for safe and effective interconnection of a
Distributed Generator with Trico’s electric distribution system.

TRAINING PRESENTATION

This presentation provides an overview of Trico’s Sunwatts program, and training/
important information for contractors installing
solar.

INTERCONNECTION MANUAL

Specifies the technical requirements for the safe and effective interconnection and operation of a Generating Facility in parallel with the Trico Distribution System.

PowerClerk Distributed Generation Application

Any installer or general contractor wishing to install, a DG Facility should complete an Installer Packet to obtain a login.

Click Here to return to the Member Installed Solar page