Breadcrumbs
Home / Renewable Energy Programs / Renewable Energy / SunWatts Program DetailsSunWatts Program Details
|
SunWatts Program Details
Trico SunWatts Data • Trico Net Metering Tariff • Trico Net Metering Application To find a licensed solar installer please refer to the AZROC Website |
|||||||||||||
|
*Residential/Non-Residential UFI Rebates: Trico to continue to reduce its UFI level consistent with the UFI level reductions, for residential and non-residential PV systems up to 10 kW, in the Tucson Electric Power Company (TEP) 2013 REST Plan. Please click here to view TEP's 2013 REST Plan Decision. **Performance-Based Incentive (PBI) program requirements (for systems greater than 10 kW): · Eligible Renewable Energy Generation systems must be over 10 kW but less than 1 MW. · Projects 1 MW and larger are negotiated on a per-project basis relative to current market conditions. · Eligible Renewable Energy Generation systems will serve a Trico member/load. · Eligible Renewable Energy Generation systems will meet Trico’s Interconnection requirements. · Projects are evaluated as funds are available. · Evaluation includes: proposed REC price, community and system benefit, program budget, system output, and other considerations. · Top projects are awarded until budget is exhausted. · Remaining projects can be resubmitted the following evaluation period. · Installation must be completed within 8 months of acceptance or project must be resubmitted.
|
|||||||||||||
News
05.21.2013 15:00 -
18:00
Marana Farmer's Market
05.28.2013 15:00 -
18:00
Marana Farmer's Market

