The Ballpark Cost tool is to be used as an approximation for construction estimates to new residential line extensions, excluding existing service upgrades and relocations. The estimate is calculated using standard assumptions and the distance provided and is NOT intended to determine the design, route, or how facilities will be installed on your property. The actual line extension design will be determined after a Trico Designer has met with you on-site.

For underground estimate purposes, the member is responsible for all trenching and backfill, conduit installation, and equipment basement/pad installation (See Residential Line Extension Guide).

Other factors that may affect costs include, but are not limited to:

  • Permitting
  • Civil site work
  • Street crossings
  • Easements
  • Existing transformer/cable capacity